Payment Type:L/C,T/T,D/P,D/A
Incoterm:FOB,DDU,CFR,CIF,EXW,DAF,FAS,DES,FCA,CPT,CIP,DEQ,DDP
Min. Order:1 Set/Sets
Transportation:Ocean,Land,Air,Express
Port:Ningbo,Shenzhen,Shanghai
$1000-10000 /Set/Sets
Model No.: CT-2024309
Brand: Ceeto
Place Of Origin: China
Forming Method: Plastic Injection Mould
Product Material: Plastic
2D Drawing And 3D Modls Available: Platsic resin can be PP,ABS,PET,TPE,PC,PC/ABS,PE,PCR-PP,PCR-PC etc.
Mold Cavity Can Be 1 Or Multiple Cavity: Mold steel can be 718,718H,P20,P20HH,2738,and soon
Mold Base:LKM: Standard components can be Punch,DME,HASCO.
Type Of Gate:cold Runner: Type of gate:cold runner
Ejection System:Ejection Pins: Cooling lines:as per client's requirements.
Moldflow Analysis:included: 3D printing included if necessary
Support Prototype Molds: Support prototype molds
Production Mold Life:1500000 Shots: clamping force:as per mold design.
Wall Thickness As Per Product Design: Mold testing:3 official times
Cycle Times:25s: Mold packing:wooden box
Packaging: Carton + plastic film + plastic Pallets
Productivity: 50molds/years
Transportation: Ocean,Land,Air,Express
Place of Origin: Ningbo ,Zhejiang
Supply Ability: 300/days
Certificate: ISO9001
Port: Ningbo,Shenzhen,Shanghai
Payment Type: L/C,T/T,D/P,D/A
Incoterm: FOB,DDU,CFR,CIF,EXW,DAF,FAS,DES,FCA,CPT,CIP,DEQ,DDP
Over twelve thousand square meters machining building area, Zhejiang Ceeto Mold Company has been dedicated to design and manufacture high quality plastic injection mods in many fields such as Automotive industry especially new energy industry, home appliance industry, daily consumer industry, medical consumer industry and so on.
Plastic bottles are bottles made of high or low-density plastic, such as polyethylene terephthalate (PET), polyethylene (PE), polypropylene (PP), polycarbonate (PC), or polyvinyl chloride (PVC). Each of the materials mentioned has a distinct function, which includes:
Our service scope refers to plastic three D printing, prototype molds design and manufacturing, two D mold assembly design, Mold-flow analysis, production mold design and manufacturing, plastic injection molding service as well.
Mold processing includes milling machine processing, wire cutting, electric discharge, polishing and other processes. The first is the machining process of the lathe and the milling machine, and the basic parts of the mold are milling to achieve the size of the design requirements.
Then, wire cutting is carried out to cut the outline of the mold. The next step is EDM, which processes small parts of the mold by means of discharge corrosion, and finally polishes to make the surface of the mold smooth and smooth.
After plastic mold processing is completed,, various components are assembled according to mold design requirements, and then the mold is going to be fully tested. The mold test mainly includes the opening and closing action of the mold, the adjustment of the ejector mechanism, inspection of the cooling system, inspection of the hot runner system of the hot runner mold, and so on
After the completion of the mold assembly and debugging, the mold injection molding began. First of all, the plastic particles are added to the bucket of the injection molding machine, and then through heating and the push of the screw, the plastic is melted and injected into the mold cavity, in the mold, the plastic gradually cools and solidifies, and finally forms the shape of the required product.
…… FAQ ……
Q1: Do you send samples for customized products?
A: Yes, we,Zhejiang Ceeto Mold Co., Ltd. is mainly manufacturing customized stainless steel products. We welcome sample orders to test and check product quality.Mixed samples are also acceptable for us.
Q2: What about deep drawing dies development delivery time?
A: lt usually takes 25 days ~ 45 days stamping dies such as deep drawing dies according to different products, much more complicated products will take longer time for example approx.. 45 days.
Q3: Do you have a minimum order quantity limit?
A: The minimum order quantity is low, and 1pc sample is available for quality inspection
Q4: How do you deliver sample goods and how long does it take to arrive?
A: We usually deliver sample goods by DHL.UPS.FedEx or TNT. It usually takes 3-5 days to arrive Aviation and shipping are also optional.
Q5: How to purchase stainless steel products?
A: First. kindly share with us your technical request or application requirements such as sample or 2D drawings or 3D models. Secondly, we offer you a reasonable quotation in details according to your request. Customers confirm samples and place deposit for formal order.Then, we arrange production or stamping dies development.
Q6: Can my logo be printed on stainless steel products?
A: Yes. Please inform us before our production and confirm any logo design according to our samples.