Payment Type:L/C,T/T,D/P,D/A
Incoterm:FOB,DDU,CFR,CIF,EXW,DAF,FAS,DES,FCA,CPT,CIP,DEQ,DDP
Min. Order:1 Set/Sets
Transportation:Ocean,Land,Air,Express
Port:Ningbo,Shenzhen,Shanghai
$5000-17000 /Set/Sets
Brand: Ceeto
Place Of Origin: China
Product Material: Plastic
Forming Method: Plastic Injection Mould
2D Drawing And 3D Modls Available: Platsic resin can be PP,ABS,PET,TPE,PC,PC/ABS,PE,PCR-PP,PCR-PP,PCR-PCetc.
Mold Cavity Can Be 1 Or Multiple Cavity: Mold steel can be 718,718H,P20,P20HH,2738.and soon.
Mold Base:LKM: Standard components can be Punch,DME,HASCO.
Type Of Gate:cold Runner: Hot runner system can be synventive Yudo etc.
Ejection System:Ejection Pins: Cooling lines:as per client's requirements.
Moldflow Analysis:included: 3D printing included if necessary
Support Prototype Molds: Support production molds
Production Mold Life:1500000 Shots: Clamping force:as per mold design
Wall Thickness As Per Product Design: Mold testing:3 official times
Cycle Times:25s: Mold packing:wooden box
Packaging: wooden case
Productivity: 50000
Transportation: Ocean,Land,Air,Express
Place of Origin: China,Ningbo
Supply Ability: 50,000pcs/Day
Certificate: ISO
Port: Ningbo,Shenzhen,Shanghai
Payment Type: L/C,T/T,D/P,D/A
Incoterm: FOB,DDU,CFR,CIF,EXW,DAF,FAS,DES,FCA,CPT,CIP,DEQ,DDP
The production process of water bottle blow molding mold mainly includes the following steps:
1. Design the mold: design the structure and size of the mold according to the shape and size requirements of the water bottle. Mold design is usually carried out using computer aided design software.
2. Make mold core cavity: Make mold core cavity according to mold design drawings. High hardness metal materials, such as aluminum alloy or stainless steel, are usually used for precision machining by CNC machine tools.
3. Make mold core: Make mold core according to mold design drawings. The mold core is usually the internal cavity part of the mold, and is also made of high-hardness metal materials.
4. Assemble the mold: Assemble the mold core cavity and mold core to form a complete mold structure. The mold core cavity and the mold core are usually fixed together by threading or bolts.
5. Debugging mold: Install the assembled mold on the blow molding machine for debugging. During the debugging process, parameters such as the opening and closing speed, temperature and pressure of the mold need to be adjusted to ensure the forming effect of the water bottle.
6. Production of water bottles: After commissioning, the mold can be used for mass production of water bottles. In the production process, the plastic particles are heated and melted, and then the melted plastic is blown into the mold through the blowing mechanism, and after cooling, the water bottle is formed.
7. Mold maintenance: Regular maintenance and maintenance of the mold, including cleaning the mold, repairing the damaged part of the mold and replacing the worn mold parts. This can extend the service life of the mold and ensure the production quality.
…… FAQ ……
Q1: Do you send samples for customized products?
A: Yes, we,Zhejiang Ceeto Mold Co., Ltd. is mainly manufacturing customized stainless steel products. We welcome sample orders to test and check product quality.Mixed samples are also acceptable for us.
Q2: What about deep drawing dies development delivery time?
A: lt usually takes 25 days ~ 45 days stamping dies such as deep drawing dies according to different products, much more complicated products will take longer time for example approx.. 45 days.
Q3: Do you have a minimum order quantity limit?
A: The minimum order quantity is low, and 1pc sample is available for quality inspection
Q4: How do you deliver sample goods and how long does it take to arrive?
A: We usually deliver sample goods by DHL.UPS.FedEx or TNT. It usually takes 3-5 days to arrive Aviation and shipping are also optional.
Q5: How to purchase stainless steel products?
A: First. kindly share with us your technical request or application requirements such as sample or 2D drawings or 3D models. Secondly, we offer you a reasonable quotation in details according to your request. Customers confirm samples and place deposit for formal order.Then, we arrange production or stamping dies development.
Q6: Can my logo be printed on stainless steel products?
A: Yes. Please inform us before our production and confirm any logo design according to our samples.