Payment Type:L/C,T/T,D/P,D/A,Paypal
Incoterm:FOB,CFR,CIF,FCA,EXW,FAS,CPT,CIP,DEQ,DDP,DES,DAF,Express Delivery,DDU
Min. Order:1000 Set/Sets
Transportation:Ocean,Air,Land,Express
Port:Ningbo,Shanghai
$10000≥1000Set/Sets
Model No.: CT-10368
Brand: Ceeto
Place Of Origin: China
Forming Method: Plastic Injection Mould
Product Material: Plastic
Product: Household Product
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Plastic Material: ABS
Process Combination Type: Single-Process Mode
Application: Household Appliances
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Packaging: Wooden box
Productivity: 500000shots/mold life
Transportation: Ocean,Air,Land,Express
Place of Origin: China
Supply Ability: 5sets/month
Certificate: ISO
HS Code: 8480790090
Port: Ningbo,Shanghai
Payment Type: L/C,T/T,D/P,D/A,Paypal
Incoterm: FOB,CFR,CIF,FCA,EXW,FAS,CPT,CIP,DEQ,DDP,DES,DAF,Express Delivery,DDU
Requested high polishing or mirror polishing refrigerator drawer plastic mould, production capacity for moulds is about 400 sets/year. Detailed Mould Description, mould design software: UG, Pro-E, Solidwork , mould cavity is Single cavity, mould base can be LKM, DME, HASCO, PUNCH etc., mould cavity and core steel is 2738 or P20 ( HRC 38-42 ), type of gate is hot runner ( Direct gate ), and hot runner name brand is Mold-master. Cycle time: 35', and mould making Lead time is 60 days from mould design approval to the first shot, ejection system: ejectors pins.
Our core competition
Machining process
High-speed EDM milling
Gun drilling machining
FAQ:
Q1: How do you control quality?
We strictly following product 2D drawing to use calipers and CMM measuring equipment to check critical dimensions of plastic mould or plastic sample parts, and write down dimension reports for each mould tryouts T0, T1, T2 ...
Q2: How long will you take for mould design?
Regarding fridge drawer plastic mould, we will start DFM and submit DFM report to customer when we receive product 2D and 3D model, we will start mould design when we get approval for DFM, it will take 1 week time to complete rough mould design and submit it to customer for review, we may improve mould design and complete all components including cooling after receiving customer's feedback, 2 weeks more will be added until we have got approval of mould design from customer.
Q3: Are you doing dry cycle for the mould before shipping?
Yes, we have been always implementing dry cycle before shipping, the empty cycle is about 2000 times. It will check mould function to avoid any damage happen when mould is shipped to the customer site.