Payment Type:L/C,T/T,D/P,D/A,Paypal
Incoterm:FOB,DDU,CFR,Express Delivery,CIF,EXW,DAF,FAS,DES,FCA,CPT,CIP,DEQ,DDP
Min. Order:500 Set/Sets
Transportation:Ocean,Land,Air,Express
Port:Ningbo,Shanghai,Shenzhen
$1000-10000 /Set/Sets
Brand: Ceeto
Place Of Origin: China
Forming Method: Plastic Injection Mould
Product Material: Plastic
2D Drawing And 3D Modls Available: Platsic resin can be PP,ABS,PET,TPE,PC,PC/ABS,PE,PCR-PP,PCR-PC etc.
Mold Cavity Can Be 1 Or Multiple Cavity: Mold steel can be 718,718H,P20,P20HH,2738,and soon
Mold Base:LKM: Standard components can be Punch,DME,HASCO., Cooling lines:as per client's requirements.
Ejection System:Ejection Pins: Cooling lines:as per client's requirements.
Moldflow Analysis:included: 3D printing included if necessary
Support Prototype Molds: Support production molds
Production Mold Life:1500000 Shots: clamping force:as per mold design.
Wall Thickness As Per Product Design: Mold testing:3 official times, Mold packing:wooden box
Packaging: Carton + plastic bag
Productivity: 50000 set/
Transportation: Ocean,Land,Air,Express
Place of Origin: Ningbo
Supply Ability: 5000 piece/month
Certificate: ISO9001
Port: Ningbo,Shanghai,Shenzhen
Payment Type: L/C,T/T,D/P,D/A,Paypal
Incoterm: FOB,DDU,CFR,Express Delivery,CIF,EXW,DAF,FAS,DES,FCA,CPT,CIP,DEQ,DDP
Zhejiang Ceeto Mold company has very strict Plastic Injection Mold building processes, injection mold first of all to carry out the mold design, mold designers according to the shape of the product, size and injection process requirements, the top of the mold structure and parts of the size, the design is approved by the customer, before the mold processing.
Mold processing includes milling machine processing, wire cutting, electric discharge, polishing and other processes. The first is the machining process of the lathe and the milling machine, and the basic parts of the mold are milling to achieve the size of the design requirements.
Then, wire cutting is carried out to cut the outline of the mold. The next step is EDM, which processes small parts of the mold by means of discharge corrosion, and finally polishes to make the surface of the mold smooth and smooth.
After plastic mold processing is completed,, various components are assembled according to mold design requirements, and then the mold is going to be fully tested. The mold test mainly includes the opening and closing action of the mold, the adjustment of the ejector mechanism, inspection of the cooling system, inspection of the hot runner system of the hot runner mold, and so on
After injection molding, it is necessary to cool and demoulding, and the cooling system takes away the heat in the mold through the circulating cooling water, so that the plastic is cooled rapidly. After the cooling is completed, the mold is opened and the demoulding device is pushed to make the plastic products fall off from the mold.