Payment Type:L/C,T/T,D/P,D/A,Paypal
Incoterm:FOB,CFR,CIF,FCA,EXW,FAS,CPT,CIP,DEQ,DDP,DES,DAF,Express Delivery,DDU
Min. Order:1 Set/Sets
Transportation:Ocean,Air,Land,Express
Port:Ningbo,Shanghai,Shenzhen
$1000-50000 /Set/Sets
Model No.: CT-10853
Brand: Ceeto
Place Of Origin: China
Forming Method: Plastic Injection Mould
Product Material: Plastic
Product: Household Product
Shaping Mode: Injection Mould
Surface Finish Process: Powder Coating
Mould Cavity: Single Cavity
Plastic Material: PE
Process Combination Type: Single-Process Mode
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Packaging: Wooden box
Productivity: 500000shots/mold life
Transportation: Ocean,Air,Land,Express
Place of Origin: China
Supply Ability: 20pcs/month
Certificate: ISO
HS Code: 8480790090
Port: Ningbo,Shanghai,Shenzhen
Payment Type: L/C,T/T,D/P,D/A,Paypal
Incoterm: FOB,CFR,CIF,FCA,EXW,FAS,CPT,CIP,DEQ,DDP,DES,DAF,Express Delivery,DDU
The plastic pieces above the two outdoor side-pulled tents are small plastic pieces, and the plastic material is PP. The injection mold type can be 4 products on a set of molds. mold cavity is 4 cavity. PP is brittle at low temperature, not wear-resistant and easy to aging. Suitable for making general mechanical parts, corrosion resistant parts and insulating parts. Ceeto Molding is professional mold maker for making Automotive air conditioner plastic injection moulds for more than 20 years, we export about 400 sets moulds yearly to most countries such as USA, Mexico, Australia, Canada, Egypt, Malaysia etc. We have been made all kinds of car air conditioner plastic moulds for most of OEMs.
How to control quality?
Regarding quality control of plastic injection moulds, there are three steps:
1. Mould Material checking
- Mould Steel Checking (Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's technical requirements once again before mould shipment
What can we guarantee: