Payment Type:L/C,T/T,D/P,D/A,Paypal
Incoterm:FOB,CFR,CIF,FCA,EXW,FAS,CPT,CIP,DEQ,DDP,DES,DAF,Express Delivery,DDU
Min. Order:1 Set/Sets
Transportation:Ocean,Air,Land,Express
Port:Ningbo,Shanghai,Shenzhen
$1000-50000 /Set/Sets
Model No.: CT-1043
Brand: Ceeto
Place Of Origin: China
Forming Method: Plastic Injection Mould
Product Material: Plastic
Product: Household Product
Shaping Mode: Injection Mould
Surface Finish Process: Powder Coating
Mould Cavity: Single Cavity
Plastic Material: PE
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Packaging: Wooden box
Productivity: 500000shots/mold life
Transportation: Ocean,Air,Land,Express
Place of Origin: China
Supply Ability: 20pcs/month
Certificate: ISO
HS Code: 8480790090
Port: Ningbo,Shanghai,Shenzhen
Payment Type: L/C,T/T,D/P,D/A,Paypal
Incoterm: FOB,CFR,CIF,FCA,EXW,FAS,CPT,CIP,DEQ,DDP,DES,DAF,Express Delivery,DDU
Food Glass Household Disposable Round Plastic Bowls are widely used in our daily lifes espcially a fast-paced life today, mould life requests at least 500000shots. Injection material must be Food grade PP, Wall thickness: 1.3mm, mold cavity: 1 cavity ( can be multi-cavity ), type of gate is Hot runner, and ot runner supplier is Synventive, mold steel is 718H, 2738, H13, mold base is LKM, ejection type is by ejection pins, mold standard components is DME, HASCO, LKM, PUNCH.etc.( As specified by customer ), mold life: at least 300000 shots- 1 million shots, mould making delivery time is 40 days. Transportation package: Wooden box for mold, cardboard box for products.
How to control quality?
Regarding quality control of plastic injection moulds, there are three steps:
1. Mould Material checking
- Mould Steel Checking (Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's technical requirements once again before mould shipment
What can we guarantee: